Cranston Basement Development
950
square feet
12
weeks
Cranston Basement Development
This basement makes life bigger with two bedrooms, hobby spaces and a brand new electric fireplace
This basement included 2 bedrooms, a sewing room, a work room for hobbies, a bathroom with a custom-built shower, a living room, and a large library/reading room. We even removed a strange gas fireplace upstairs and added a new built in electric fireplace. The basement floor was completed with carpet throughout the living areas and the bedrooms, and the bathroom was completed with large waterproof vinyl tiles. The shower included 5mm euro glass sliding doors, 24x12” tile, and a custom-built vanity to match a desired one that was unavailable. We added carpet runners to the stairs as our client found them a bit slippery. This was a great project to work on for more awesome clients!
Highlights
Two New Bedrooms
Two new bedrooms alongside a sewing and work room make this a spacious addition.
Custom Bathroom
A bespoke vanity and custom shower with a 6mm clear glass sliding door complete the downstairs.
Soundproofing
We added soundproof insulation and sonopan sheeting to the bedroom walls and ceiling so everyone sleeps quietly.